OEE calculator

What does downtime cost you?

A few numbers, ten seconds. Estimates are enough — the goal is to see the order of magnitude.

MachineTakt · OEE estimate

Your numbers

Estimate

Your OEE

84.9%

0.1 pp below world class

Availability
87.5%
Performance · assumed
100.0%
Quality
97.0%
4,000 h
hours lost per year
Enter the value of an hour to see the loss in denars.
How it is calculated
  • Planned time = shifts × hours × days × machines = 32,000 h
  • Availability = (shift time − downtime) / shift time = 87.5%
  • Performance = as entered, or 100% if empty (MachineTakt measures it exactly) = 100.0%
  • Quality = 1 − scrap = 97.0%
  • OEE = availability × performance × quality = 84.9%
  • Hours lost = downtime × shifts × days × machines = 4,000 h
  • Value lost = hours lost × value per hour = —

An indicative estimate, not a guarantee of savings. Downtime is only the availability loss; slow running and micro-stops belong to performance.

Book a demo with your numbers

The estimate travels with your request — in the demo we compare it with what MachineTakt would measure in your plant.

From estimate to measurement

  1. Downtime is measured by the system, not recalled at the end of the shift.
  2. Every minute gets a reason — you see which loss is the biggest.
  3. Performance and micro-stops are measured from the machine pulse.

See how it works →